My Quote 61

Amazing Play Space – Knowle Park Primary – August 2025

Knowle Park Primary had a very tired, rotten old timber play area which was unsafe and not fit for purpose, offering very limited play value. We were asked to attend site to conjure some amazing designs that could transform the space into a play area the school could be proud of.

We were provided some ideas the school had been given by other suppliers but didn’t fit their brief. Rhino Play took all the site measurements, met the school team and discussed at length, the safety, brief and budget constraints and went away to create a bespoke play area that could be loved for years to come.

A Range of Excellent Play Provision

The new design completely re-imagined the space. The old space was segregated areas of individual bark pits, with basic, but oversized play equipment that only offered limited play value. Rhino came up with a merged giant bark pit with linked play equipment offering a play space with social interaction, play and challenge the whole school could enjoy and experience. Using a combination of an adventure climber pole unit, trim trail and treated sleepers, the new area made the best of the space available. The concept also included bark top up to improve the safety of the area and offer compliancy to the BSEN standards.

The equipment we installed was the Devon Climber, wobble steps, twister net, rolling log and split traverse wall. The photographs show the playgrade playground equipment installed into a new area of playgrade bark, held within a playgrade treated sleeper pit.

The Benefits Of The New Playground Design

 

  • We created a climbing, traversing play space filling the area and making use of every square metre of space available.
  • Designed for year-round use in various weather conditions, offering excellent value for money.
  • The design offers play value, challenge, high-capacity use and varied play experiences.
  • Promotes physical development, social interaction, challenge, a diverse play experience, balance/co-ordination and upper body strength for general play, sport and PE curriculum requirements

The school loved the design, installation and could not wait for the children to return after the summer holidays to their new amazing play area!

pull up bars as part of ongoing wooden trim trail in playground
£33,000
£33,000

Inspired by this project?

Get in touch to start your project
Enquire Now

Products Used In This Project

Featured Case Studies

Trim Trail

Trim Trail Wizardry At West Hill Primary School – January 2022

Having a high-quality, entertaining and physically and mentally challenging playground for children to learn, play and socialise in is...

Read More

Artificial Grass Trim Trail – Lochinver House School – October 2025

After completing a larger surfacing, gazebo and traverse wall project earlier in the year, the team at Lochinver House...

Read More
Trim Trail in recycled (Farway) (1)

Recycled Plastic (non rotting) Trim Trail – Farway Primary, East Devon – April 2024

When the 15 or so year old timber trim trail rotted out completely at Farway Primary, set in a...

Read More
looped recycled trails

Recycled Plastic Trim Trails – Bickleigh Down Primary, Plymouth – May 2023

Rhino Play SW & Bickleigh Down Primary in Plymouth, worked well together to provide their KS1 & KS2 children...

Read More
See More Case Studies
Contact Us Button Read Our Catalogue Button