My Quote 0

Artificial Grass Trim Trail – Lochinver House School – October 2025

After completing a larger surfacing, gazebo and traverse wall project earlier in the year, the team at Lochinver House School approached us to help come up with a low-level trim trail which could be installed into the existing artificial grass pitch. Rhino Play attended site to measure up and discuss the safety and conformity regulations based on installing new equipment in already established artificial grass.

We came up with a design that could suit users from 5 years plus and offer challenge and variety in the trail equipment whilst fitting to a strict budget. During the October half term, we installed 6 individual trail items to create a wonderful trail which could give the children access to play all year round.

Trail Playground Equipment:

The Trapeze Swing introduces an upper body strength element, whilst the Clatter Bridge adds an exciting sensory dimension with its distinctive movement and sound when traversed. These thoughtfully selected additions enhance the overall play value significantly.

Existing Safety Surfacing:

As the artificial grass was already in place, we could only offer trail items with a fall height under 0.6m as the existing grass did not have shockpad already installed. The surface was carefully cut open for the foundations of the trim trail pieces to be installed, then expertly re-seamed and repairs to hide any excavation works.

The trail was then independently inspected, allowing the school to open the trail for the return of the children after the half term break. The photographs show the beautiful and exciting trail installation ready for use by the children.

Key Benefits of The Installation

  • Creates a continuous 18.8m long trail where children can remain off the ground, developing crucial balance and coordination skills.
  • Designed for year-round use in various weather conditions, offering excellent value for money and utilising a pre-installed artificial grass surface.
  • Modular design allows for future expansion as budgets permit, providing a scalable solution that can grow with the school’s needs
  • Promotes physical development and balance skills in line with the EYFS framework and Key Stage 1/2 PE curriculum requirements

The school were extremely happy that this great trail could be installed and open ready for the children in the autumn/winter terms whilst meeting the strict budget requirements

£9,297
£9,297

Inspired by this project?

Get in touch to start your project
Enquire Now

Products Used In This Project

Featured Case Studies

EYFS safety surfacing and markings

Our fantastic EYFS Outdoor Area project – Torquay, Devon – April 2022

Back in early 2021 Rhino Play SW were asked by Cockington Primary School, part of Coast Academies Trust, to...

Read More
Traversing Trees & whole trail

Trim Trail replacement – St Leonards, Exeter – May 2022

Rhino Play was invited to visit the local Exeter primary school, St Leonards -part of St Christophers C of...

Read More
Trim Trail in recycled (Farway)

Recycled Plastic (non rotting) Trim Trail – Farway Primary, East Devon – April 2024

When the 15 or so year old timber trim trail rotted out completely at Farway Primary, set in a...

Read More
looped recycled trails

Recycled Plastic Trim Trails – Bickleigh Down Primary, Plymouth – May 2023

Rhino Play SW & Bickleigh Down Primary in Plymouth, worked well together to provide their KS1 & KS2 children...

Read More
See More Case Studies
Contact Us Button Read Our Catalogue Button