My Quote 0

Bonded Rubber Mulch – Fringford, Oxfordshire – July 2026

Fringford Parish Council contacted Rhino Play after an inspection report highlighted compliance and safety issues with their existing safety surface.

The Challenge at Fringford

  • Existing grass safety mats had sunk beneath the soil
  • No grass growing due to the tree canopies overhead
  • An undulating floor posing trip hazards, with concrete foundations exposed in places

The brief was to use a recycled surface with low maintenance and free-draining properties.

Why Bonded Rubber Mulch Was the Right Fit

Bonded Rubber Mulch, laid over the existing grass mats with some stone sub-base to reduce the severe slopes, was the best product to meet the brief.

  • Fully conforms to standards for fall heights and safety areas
  • Low maintenance, so the parish council doesn’t need to manage grass growth under tree cover again
  • Free-draining, keeping the area usable whatever the weather
  • A green finish that suits the rural setting without detracting from the beauty of the area

See our full range of playground safety surfacing options on our website.

The Results

The installation team completed the job efficiently and professionally during the summer heatwave. The council were exceedingly happy with the installation, the team and all involved with the project, and the play area was back open within a week, giving children an all-weather area to play on.

Thinking About Bonded Rubber Mulch For Your Playground?

If your playground has safety surfacing that’s ageing, sinking or causing drainage problems, we’d love to help. Email us on info@rhinoplay.co.uk or call 01803 873711 to arrange a free, no-obligation site visit. We’ve used the same surface at St Andrew’s Pre School and Wroughton Infants – see our full guide to playground safety surfacing for more.

Village playground with climbing net, swing frame and spring riders on rubber mulch surfacing

Inspired by this project?

Get in touch to start your project
Enquire Now

Products Used In This Project

Featured Case Studies

Environmental Approach in Exeter – St Thomas Primary Exeter, Devon – October 2026

When it came to replacing the rotten timber climber that previously stood there, it was agreed that the most...

Read More

Sustainability & Longevity of our Recycled Play Equipment – Tavistock Town Council, West Devon – October 2026

The sustainability & Longevity of our Recycled Play Equipment was utmost in the decision making for a substantial piece...

Read More

Timber Trim Trail Replacement – Shakespeare School, Plymouth – September 2026

Timber Trim Trail Replacement; In the summer holidays of 2026 one of our projects was to rip out &...

Read More
Newly laid level artificial grass play area with a curved kerbed edge beside a single storey building

New Artificial Grass Play Area – Woodfield St George, Shrewsbury – Summer 2026

Woodfield St George in Shrewsbury, Shropshire, had a large old area of artificial grass that was undulating with lumps...

Read More
See More Case Studies
Contact Us Button Read Our Catalogue Button