Play ship delights at The Duchy School – The summer holiday of 2026 saw our teams being kept very busy on another prestigious project for Harbour Schools Partnership in Mid Devon.
This project involved the removal of all of the existing play equipment and 220m² of existing wet pour rubber. We then set about installing our massive Trident Playboat, adapting the design and components to meet the school’s request for a design that matched their own children’s abilities and allowed for staff supervision.
Here’s the specification:
We also supplied, delivered and installed 220m² of black wet pour rubber safety surfacing with a 10% colour fleck, at 50mm thick. This covered the entire existing area.
The finished project gives the children a fantastic playtime facility in what was an underused and tired-looking area.
A lovely comment from Mr Roberts (Headteacher):
First and foremost I want to express my sincere thanks for the work of your team installing the new play equipment at Duchy. Parents, children, staff and I are overwhelmingly delighted with it. You can see the pride and care that went into its manufacture and installation.