Amazing Ashburton’s recycled plastic trim trail – April 2026 – Ashburton Primary, Devon

Amazing Ashburton! During the Easter holidays of 2026, our teams worked hard to ensure that Ashburton Primary’s brand new recycled plastic trim trail was fully installed for when the children returned after easter.

We were chosen as the preferred contractor by Westcountry Schools Trust due to being a trusted contractor and being able to offer a beautifully arranged trim trail for KS1 KS2, made using non rotting, non splintering, sustainable recycled plastic. WEST along with the school chose to us and this material due to experience with other sites and the huge lifespan that recycled plastic play and trim trail equipment carries. This alongside minimal maintenance for years to come.

Making Use Of Existing Playground Features

We designed this to utilise an existing patch of wet pour rubber, to save removal and the huge cost involved, but we then encompassed the whole surface with our high quality artificial grass. This gave the school new use of this space alongside being easy to supervise and manage. This is something that we took into account when designing from the beginning, whereas some alternative quoting companies didn’t allow for this, this is where being very experienced playground professionals comes into it’s own.

The layout allows use in various ways, by the whole school age group and allows children to sue the items individually, or as a clustered trail.

These photos were taken a few weeks later and when visiting the school mentioned how very happy they are with the finished project and handling of it. This is a great asset for the school, the MAT and for us. Thanks to all.

Recycled plastic trim trail with a climbing ramp and stepping posts on an artificial grass play area in a school
£26,500 + vat
£26,500 + vat

Inspired by this project?

Get in touch to start your project
Enquire Now

Featured Case Studies

Recycled plastic trim trail at St Thomas Primary, Exeter

Environmental Approach in Exeter – St Thomas Primary Exeter, Devon – October 2026

When it came to replacing the rotten timber climber that previously stood there, it was agreed that the most...

Read More
New recycled plastic play equipment at the Meadows Play Area, Tavistock

Sustainability & Longevity of our Recycled Play Equipment – Tavistock Town Council, West Devon – October 2026

The sustainability & Longevity of our Recycled Play Equipment was utmost in the decision making for a substantial piece...

Read More
Timber trim trail replacement at Shakespeare Primary, Plymouth

Timber Trim Trail Replacement – Shakespeare School, Plymouth – September 2026

Timber Trim Trail Replacement; In the summer holidays of 2026 one of our projects was to rip out &...

Read More
Newly laid level artificial grass play area with a curved kerbed edge beside a single storey building

New Artificial Grass Play Area – Woodfield St George, Shrewsbury – Summer 2026

Woodfield St George in Shrewsbury, Shropshire, had a large old area of artificial grass that was undulating with lumps...

Read More
See More Case Studies
Contact Us Button Read Our Catalogue Button