
Amazing Ashburton! During the Easter holidays of 2026, our teams worked hard to ensure that Ashburton Primary’s brand new recycled plastic trim trail was fully installed for when the children returned after easter.
We were chosen as the preferred contractor by Westcountry Schools Trust due to being a trusted contractor and being able to offer a beautifully arranged trim trail for KS1 KS2, made using non rotting, non splintering, sustainable recycled plastic. WEST along with the school chose to us and this material due to experience with other sites and the huge lifespan that recycled plastic play and trim trail equipment carries. This alongside minimal maintenance for years to come.
We designed this to utilise an existing patch of wet pour rubber, to save removal and the huge cost involved, but we then encompassed the whole surface with our high quality artificial grass. This gave the school new use of this space alongside being easy to supervise and manage. This is something that we took into account when designing from the beginning, whereas some alternative quoting companies didn’t allow for this, this is where being very experienced playground professionals comes into it’s own.
The layout allows use in various ways, by the whole school age group and allows children to sue the items individually, or as a clustered trail.
These photos were taken a few weeks later and when visiting the school mentioned how very happy they are with the finished project and handling of it. This is a great asset for the school, the MAT and for us. Thanks to all.