Rhino Play were awarded the wet pour safety surface contract to provide a new surface installation at WESC Foundation in Exeter. It was a pleasure completing this project for the foundation.
The WESC Foundation is a specialist day and residential centre offering a unique experience for young people and adults with visual impairment and complex needs.
The works included ground preparation, and the supply and installation of 236m² of colour EPDM rubber at varying thicknesses, all completed ensuring a high level of health and safety throughout.
Wet pour safety surfacing provides a practical, safe surface designed to absorb impact, installed to the required thickness in line with the current BS EN 1176/77 standard. Being poured on-site rather than laid in sections, it creates a smooth, seamless, and level finish across the whole area – an important consideration for a site supporting users with visual impairment or complex mobility needs, where trip hazards and uneven joins are best avoided.
The completed installation gave WESC Foundation a safe, durable, and consistent surface across the full site area – a project the Rhino Play team was genuinely pleased to be part of.
Interested in a safety surfacing project for your site? Get in touch with our team today to discuss your requirements.