My Quote 0

Torquay outdoor teaching just got better, all in time for Winter 2020

Over the summer of 2020 we supplied & installed our superb 5m diameter, Outdoor classroom Gazebo at this Torquay Primary School. This new sheltered classroom & teaching area replaced a what was previously a bare area of soil within an existing green outdoor carpet. With the shelter set on a prominent high point, the design, structural strength & usability had to be thought about properly. For this we provided solid half sides to give some protection to users on the inner benches & we also extended the roof out to provide more of a rain protection factor. The entrance is situated to provide good supervision & the most easiest access to all of the pupils at St Margaret’s Academy.

We surfaced the inner area & outer rim of the outdoor classroom teaching area with our rubber mulch safety surface. This surface provides a seamless step-less surface from the carpet & also flows with the ground contours, it doesn’t puddle & offers a more comfortable seating experience if pupils decide to sit on the floor inside.

As you can see it blends in so well too & compliments the area perfectly for outdoor teaching opportunities.

5m Gazebo outdoor classroom

Inspired by this project?

Get in touch to start your project
Enquire Now

Featured Case Studies

Newly laid level artificial grass play area with a curved kerbed edge beside a single storey building

New Artificial Grass Play Area – Woodfield St George, Shrewsbury – Summer 2026

Woodfield St George in Shrewsbury, Shropshire, had a large old area of artificial grass that was undulating with lumps...

Read More
A-frame ramp and net climber and a play mound with tunnel on artificial grass, edged with bonded rubber mulch

EYFS Play Area Redesign – Elmlea Infant and Junior School, Bristol – August 2026

Elmlea Infant and Junior School in Bristol had a well used but tired EYFS area that needed a redesign...

Read More
Playground climbing unit with metal slide and rope net ramp on bark safety surfacing

Benefits of Recycling at Bishopsteignton Primary – Bishopsteignton, Devon – September 2026

The equipment and safety surfacing was designed especially to suit this natural early years area using non rotting sustainable...

Read More
Timber bird's nest swing beside existing play tower at Greater Horseshoe School, Heathfield

More to do at Greater Horseshoe – Nest Swing in Heathfield, Devon – September 2026

During the summer holidays of 2026, Rhino Play completed another one of their much loved Birds Nest Swings at...

Read More
See More Case Studies
Contact Us Button Read Our Catalogue Button